Search by keyword: construction of BAM

The Baikal-Amur Regional and Transport Megaproject: Lessons from Exploitation

The article sums up the construction of the Baikal-Amur Mainline experience, analyzes the reasons why it was unfinished and why its exploitation is lossmaking. We show that the tunnels were not only essential for transportation, they were a large testing ground for new domestic and foreign mining operation practices, new technologies in drilling under permafrost and soil stabilization techniques. New construction technologies developed and tested at the BAM today help to masterfully build roads, tunnels and ports in extreme climatic conditions. Excessive turnover was due to mistakes made in the mainline construction project. As a result, today's villages along the BAM consist primarily of old and dil apldated houses. We draw a conclusion that state protectionist policy is required to effectively develop large-scale projects in the BAM area; the BAM will never be profitable if territories surrounding the railroad are not economically exploited. The paper demonstrated which circumstances are favorable for the BAM to specialize in handling heavy-tonnage trains and for the Trans-Siberian Railway to handle special-purpose trains

Kin A. A. kin_a@ieie.nsc.ru

Keywords: Trans-Siberian Railway transport-logistic centers Trans-Siberian Railway Baikal-Amur Mainline North-Siberian Railroad construction of BAM BAM area exploitation

Full-text issues of the Journal in PDF format are available since 2006 (except for the ones published within the last year)

pdf-icon.png